Trafik Analiz Merkezi

       Engineering & Consultancy

TREN

Turkish Airlines Operations Centre Car Park Works

Project image 1
Project image 2
Project image 3
Project image 3
Project image 3

Project Objectives

The work sets out to keep traffic moving safely and predictably throughout the construction programme at the Turkish Airlines campus, so that construction vehicles, staff and visitors can all move around and through the site with the least possible disruption. It covers adapting the existing traffic layout to the demands of construction, identifying alternative routes, improving pedestrian safety, preventing congestion at peak periods and maintaining operational continuity for the duration of the works.

The result is a traffic management system built around both safety and efficiency, reconciling the logistics of an active construction site with day-to-day operational travel.

Project Details

City: Istanbul

Country: Türkiye

Client: Turkish Airlines

Project Period: 2024-2026

Scope of Work: Analysis of traffic flow within and around the campus; planning of the temporary road and lane arrangements required by construction; design of vehicle and pedestrian wayfinding; identification of alternative routes; signing and information works; implementation of peak-period traffic management scenarios; and periodic revision of these measures throughout the project.