Trafik Analiz Merkezi

       Engineering & Consultancy

TREN

Adana SASA Polyester Rail Connection Line

Project image 1
Project image 2
Project image 3
Project image 4

Project Objectives

This study addresses the rising demand for raw material and finished product movements arising from the expansion of production at SASA Polyester A.Ş., and sets out how that demand can be met by rail rather than by road — the more efficient and cleaner of the two.

The connection to be built will link the plant directly to the TCDD main line, lowering logistics costs, shortening transit times, improving labour productivity and reducing the carbon emissions and wider environmental effects associated with road haulage. Operating efficiency and sustainable transport objectives are served alike.

Project Details

City: Adana

Country: Türkiye

Client: SASA Polyester Sanayi A.Ş.

Project Period: 2020-2023

Scope of Work: The project covers route definition for the rail connection, engineering design, cost estimation, and economic and financial feasibility work, together with environmental impact assessment in line with sustainable transport objectives.